My CART

Installation with Standartpark Installation Brackets

 

 

 

Installing Standartparks channels with installation brackets is very simple. 

1. Place the brackets underneath the channel connections, and attach and tighten the "v" clips where to two channels meet. This will secure the channels for horizontal movement during concrete pour.

2. Place your rebar within the rebar holes and raise or lower your system, tightening the bracket bolts when level. This will secure the channels for vertical movement during your concrete pour.

3. During your concrete pour, make sure you still take your time and make sure that your system is not moving. And that is it! Below is a diagram of installation. As always, if you have any questions please call or email Standartpark. We are always here to help. 

 

Sale

Unavailable

Sold Out