My CART

8" Channel Copper Package

  • 8" Internal width Copper grating Package
  • Comes with 100% Copper grate, channel, brackets and end caps
  • Pedestrian load rated
  • Connect multiple channels for longer run
  • 3" and 4" PVC or Corrugated pipe bottom outlet options 
  • 4" PVC or Corrugated pipe options out of the included end cap of the 8" Depth Channel
  • More product details below
$230.00
Free Shipping Over $299
FedEx 3-5 Days

Product details

Fitted with our NEW 100% COPPER GRATING - Our 8" Internal width system is fitted with multiple outlet options on the channel itself. On the 3" channel depth option you have a 4 and 6 inch bottom outlet. On the 8" Channel Depth option , the channel is fitted with a 4" out of the end cap, 4 and 6 inch out of the bottom, as well as a 4" out of the side of the system. 90 degree turns are already fitted on to the channel itself as well, so no adapters are needed. This packages comes with 100% Copper Grating. 

PARAMETERS

Article Numbers;

8" Depth - PC 8540

3" Depth - PC 8510

Copper Grating - 2510-Copper

Material ................... PPE PLASTIC / 100% Copper

Load Class .............. A Class - 3,300 LBS

INCLUDED IN PACKAGE

1 Unit - Channel Depth of Choice

1 Unit - 100% Copper Grate

2 Units - Grating Fasteners

- End Caps (Per Order) - Additional end caps at checkout.

Specification Sheet

  8" Depth Specification Sheet  

  3" Depth Specification Sheet  

  Grating Specification Sheet  

Installation

Trench Drain Installation

1. Prep your area -  prep your channel width and depth accordingly to the trench drain you purchased from us. You need a good amount of room (3-5 inches) to set your channel and pour or fill around it to have a nice level sound area with your finished project.

 

2. If pouring concrete, make sure the base (2-4 inches) is leveled out according to your site plan. Wait for the concrete to completely set before moving on.

 

3. Set your channels on the concrete pad, attach together and connect your pipe outlets according to your design. Pipe connections are designed for PVC and Drainage tile - if you wish to utilized a corrugated pipe, please use a rubber coupling with clamps. That makes for a snug fit. Seal all channels with clear silicone and make sure they are water tight and dry before your final concrete pour.

 

4. Standartpark recommends leaving your gratings in the channel when you are doing your final pour - this will alleviate any instances of your channels bending while the concrete sets. This is important so your gratings fit nice and snug after the concrete settles.

 

5. Pour and wait - Thats all!

NOTE - This package can also be used with our channel installation brackets for rebar installation (hanging installation). 

Q&A's

Questions & Answers

Have a Question?

Be the first to ask a question about this.

Ask a Question

Customer Photos

Fitted with our NEW 100% COPPER GRATING - Our 8" Internal width system is fitted with multiple outlet options on the channel itself. On the 3" channel depth option you have a 4 and 6 inch bottom outlet. On the 8" Channel Depth option , the channel is fitted with a 4" out of the end cap, 4 and 6 inch out of the bottom, as well as a 4" out of the side of the system. 90 degree turns are already fitted on to the channel itself as well, so no adapters are needed. This packages comes with 100% Copper Grating. 

PARAMETERS

Article Numbers;

8" Depth - PC 8540

3" Depth - PC 8510

Copper Grating - 2510-Copper

Material ................... PPE PLASTIC / 100% Copper

Load Class .............. A Class - 3,300 LBS

INCLUDED IN PACKAGE

1 Unit - Channel Depth of Choice

1 Unit - 100% Copper Grate

2 Units - Grating Fasteners

- End Caps (Per Order) - Additional end caps at checkout.

  8" Depth Specification Sheet  

  3" Depth Specification Sheet  

  Grating Specification Sheet  

Trench Drain Installation

1. Prep your area -  prep your channel width and depth accordingly to the trench drain you purchased from us. You need a good amount of room (3-5 inches) to set your channel and pour or fill around it to have a nice level sound area with your finished project.

 

2. If pouring concrete, make sure the base (2-4 inches) is leveled out according to your site plan. Wait for the concrete to completely set before moving on.

 

3. Set your channels on the concrete pad, attach together and connect your pipe outlets according to your design. Pipe connections are designed for PVC and Drainage tile - if you wish to utilized a corrugated pipe, please use a rubber coupling with clamps. That makes for a snug fit. Seal all channels with clear silicone and make sure they are water tight and dry before your final concrete pour.

 

4. Standartpark recommends leaving your gratings in the channel when you are doing your final pour - this will alleviate any instances of your channels bending while the concrete sets. This is important so your gratings fit nice and snug after the concrete settles.

 

5. Pour and wait - Thats all!

NOTE - This package can also be used with our channel installation brackets for rebar installation (hanging installation). 

Questions & Answers

Have a Question?

Be the first to ask a question about this.

Ask a Question
Sale

Unavailable

Sold Out